Heat supply networks and structures on them
Reconstruction of the heating main from the tie-in in the area of the Canyon Hotel to Bogenbay Ave.
Working draft
Description
Working project “Reconstruction of the heating main from the tie-in in the area of the Canyon Hotel to Bogenbay Ave. 35,33,37/1 Zhenis Ave. 41,41/1,37,39 Sverdlova St. 48/2, Saryarka Ave. 46, 2Du70 mm -400 mm"Total length of the heating network - 704.1 m
2Ø325x7 - 11.5 m
2Ø159x4.5 - 197.9 m
2Ø108x4 - 179.1 m
2Ø89x4 - 85.0 m
2Ø76x3 - 3.5 m
Branches
2Ø159x4.5 - 37.5 m
2Ø89x4 - 66.9 m
2Ø76x3 - 87.2 m
2Ø57x3 - 35.5 m
Client
Joint Stock Company "Astana-Teplotransit"
Details
Year:
2023
Region
Astana





